I. Pre-Installation Preparation

  1. Check Equipment Integrity: Verify the parts list to ensure no skiving blades, motors, drive shafts, or other components are missing or damaged.
  2. Read the Instruction Manual: Focus on technical parameters, installation diagrams, and safety warnings.
  3. Tool Preparation: Prepare necessary tools such as wrenches, spirit levels, and lubricating grease. Wear protective gear during operation.
  4. Site Requirements: Ensure the ground is level and reserve sufficient space for equipment operation and maintenance.

II. Installation Process

  1. Foundation Fixation: Secure the main frame to the concrete foundation using expansion bolts. Calibrate the levelness with a spirit level, ensuring an error ≤2mm/m.
  2. Skiving Blade Assembly: Install blades in the direction indicated by the arrow. Simultaneously check bearing lubrication and pre-tighten bolts diagonally (refer to the manual for torque specifications).
  3. Power Connection: Maintain coaxiality between the motor and drive shaft (tolerance<0.1mm). Adjust belt tension to allow a deflection of 10-15mm when pressed.

III. Commissioning & Operation

  1. No-Load Testing: Start the machine in jog mode to check rotation direction (consistent with the label). Run for 5 minutes to monitor vibration, abnormal noise, and temperature rise (bearing temperature ≤70℃).
  2. Load Commissioning: Gradually increase material input. Adjust skiving blade gaps for uniform cutting results, ensuring current does not exceed the motor’s rated value.
  3. Parameter Optimization: Fine-tune rotation speed (typically 800-1200rpm) and feeding rate based on material characteristics.

IV. Important Safety & Maintenance Tips

  1. Safety First: Operate with power off during commissioning. Never touch moving parts with bare hands.
  2. Prohibit Misoperation: Avoid overloading or unauthorized modification of the equipment structure.
  3. Lubrication Management: Replace lubricating oil after 50 hours of operation, then perform maintenance every 200 hours thereafter.
  4. Daily Inspections: Check belt tightness and blade wear daily (replace blades when wear exceeds 3mm).

V. Acceptance & Documentation

After commissioning, run the machine continuously for 2 hours without abnormalities. Record voltage, current, and output data for archiving. Beginners are advised to seek full guidance from technicians and complete safety training before use.